Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
September 18, 2024, 09:40:03 PM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 ... 16 17 [18] 19 20 ... 34   Go Down
  Print  
Author Topic: Pictures of work in progress ( HDB BTO Punggol Sails )  (Read 189393 times)
0 Members and 1 Guest are viewing this topic.
tom

Offline Offline





Ignore
« Reply #68 on: January 03, 2012, 10:58:44 AM »

Next take a look at the front elevational view of Block 207B taken from ground level along Punggol Place.

One more level up will be the roof top level, to be followed by the lifting and installation of water tank compartments.



* P1030753.JPG (271.5 KB, 640x480 - viewed 2251 times.)
Logged


Advertisement



tom

Offline Offline





Ignore
« Reply #69 on: January 03, 2012, 11:28:22 AM »

Front elevational view of Block 207A taken from ground level at Edgefield Secondary School along Punggol Place.

207A reached roof top level. Work should now be concentrated at the roof top. Roof compartments / housing, water-tanks, waterpipe connections and so on.



* P1030761.JPG (302.06 KB, 640x480 - viewed 2219 times.)
Logged
tom

Offline Offline





Ignore
« Reply #70 on: January 03, 2012, 09:41:08 PM »

Front Elevational View of Block 208C ( next to proposed mosque building ) reached roof-top level. Constructional progress similar to Block 207A.

Looks like inspection of Blocks ready for touching up, grinding of uneven surfaces should start soon. In fact on the second floor, touching up and mock up painting sample was in progress.



* P1030769.JPG (254.44 KB, 640x480 - viewed 2174 times.)

* P1030766.JPG (284.97 KB, 640x480 - viewed 2132 times.)

* P1030767.JPG (287.65 KB, 640x480 - viewed 2165 times.)
Logged
tom

Offline Offline





Ignore
« Reply #71 on: February 23, 2012, 11:38:06 AM »

Roof top water tanks for Block 207A had been lifted, installed and workers can be seen working on the necessary piping connections.

Sample colour schemes had been painted and in the next few weeks to come, inspection of the wall facades for uneven surfaces probably will be carried out.





* P2230863.JPG (313.15 KB, 640x480 - viewed 1259 times.)

* P2230864.JPG (277.78 KB, 640x480 - viewed 1244 times.)

* P2230866.JPG (227.61 KB, 640x480 - viewed 1223 times.)
Logged
Pages: 1 ... 16 17 [18] 19 20 ... 34   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.104 seconds with 20 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server