Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
March 19, 2024, 02:31:29 PM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: [1] 2 3 ... 24   Go Down
  Print  
Author Topic: Punggol Spectra ( work in progress )  (Read 142055 times)
0 Members and 1 Guest are viewing this topic.
tom

Offline Offline





Ignore
« on: April 22, 2010, 10:57:00 PM »

Punggol Spectra :

Punggol Spectra is offering a total of 1,142 standard units.

301 units of 2 room costing $89,000 to $ 109,000
285 units of 3 room costing $151,000 to $179,000
556 units of 4 room costing $234,000 to $293,000

Area of a 2 room flat, 46 to 47 sqm.
Area of a 3 room flat, 69 sqm.
Area of a 4 room flat, 94 to 96 sqm.

Punggol Spectra is located along Punggol Central, bounded by Edgefield Plains and Edgedale Plains, next to Horizon Primary School served by the Oasis LRT Station.

As it is now, the construction site is fenced up. When the actual building construction work begins, we will then capture monthly work in progress pictures for review.

Logged


Advertisement



tom

Offline Offline





Ignore
« Reply #1 on: May 13, 2010, 08:24:50 PM »

As of today, excavators are busy digging the ground. Several pile drilling machines are station on different locations drilling, in preparation for steel reinforcement cage / grouting / concreting.

At one location nearer to the main road ( Punggol central ) several Cement Mixers are unloading ready made grout / concrete into a " cast-in-situ " pile.

In fact hundredth of foreign workers are deployed at " Spectra " working all over the enclosed building site. Some general workers are seen washing trucks and cement mixers as they leaves the muddy ground to make sure the vehicles don't dirty our roads.

" Cast-in-situ piles "  on two locations are ready and load testings are in progress.

In the middle of the site, ready fabricated steel reinforcement cages are stack ready for use. It is  estimated that  in a couple of weeks, the actual Building work should commence.


* IMGP1846.JPG (301.87 KB, 800x600 - viewed 11997 times.)

* IMGP1857.JPG (299.82 KB, 800x600 - viewed 12038 times.)

* IMGP1872.JPG (319.2 KB, 800x600 - viewed 12068 times.)

* IMGP1853.JPG (278.45 KB, 800x600 - viewed 11930 times.)
Logged
tom

Offline Offline





Ignore
« Reply #2 on: May 23, 2010, 10:29:35 PM »

It's almost 7.45 pm, cement mixers are still busy waiting for their turn to unload concrete into cast piles.

In another 3 to 4 week's time, it is not surprising, the main building work will commence.



* IMGP1918.JPG (236.86 KB, 800x600 - viewed 11861 times.)
Logged
tom

Offline Offline





Ignore
« Reply #3 on: June 22, 2010, 10:49:17 PM »

The last picture was taken on 15th May 2010. Heavy machinery were at site working on the piling systems. Concrete mixers were very busy moving in and out of the construction site at regular intervals. Other than that, the ground is still flat.

Five weeks later, concrete piles for three blocks / sites nearer to the school were completed and ground excavated exposing the top portion of the completed r.c.piles.

Steel reinforcements of the r.c.piles were straightened and extended. Timber formworks erected to the require size, followed by concreting.

Fabrication of steel reinforcements for walls and columns for the ground floor are in progress. Very soon we'll see the structures erected for the complete floor. In another four weeks, it's not surprising, the first floor will be up for the three blocks.



* IMGP2581.JPG (313.02 KB, 800x600 - viewed 11760 times.)

* IMGP2583.JPG (307.3 KB, 800x600 - viewed 11699 times.)

* IMGP2608.JPG (311.63 KB, 800x600 - viewed 11230 times.)

* IMGP2587.JPG (306.95 KB, 800x600 - viewed 11185 times.)
Logged
Pages: [1] 2 3 ... 24   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.255 seconds with 20 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server