Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
September 19, 2024, 12:03:43 PM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 ... 17 18 [19] 20 21 ... 34   Go Down
  Print  
Author Topic: Pictures of work in progress ( HDB BTO Punggol Sails )  (Read 189403 times)
0 Members and 1 Guest are viewing this topic.
tom

Offline Offline





Ignore
« Reply #72 on: February 23, 2012, 09:27:58 PM »

At 208C the water tanks are also installed with workers on the necessary piping systems. There are also rc. structures now under construction above roof level. Scaffoldings were erected around the structures for work to be carried out.

In between Blocks 207A and 208C, the multi storey carpark is also under construction. At the moment reaching the roof top gardens top level.



* P2230878.JPG (280.6 KB, 640x480 - viewed 2399 times.)

* P2230875.JPG (312.56 KB, 640x480 - viewed 2238 times.)

* P2230873.JPG (264.88 KB, 640x480 - viewed 2246 times.)
Logged


Advertisement



tom

Offline Offline





Ignore
« Reply #73 on: March 29, 2012, 10:00:33 PM »

Picture taken from Arcadia shows a perspective view of Punggol Sails, Blocks 207A, 208C, 207D, 208B and the multi-storey-carpark with roof-top garden 207.

Next to it, a mosque site, so far no activities spotted.



* P3240434.JPG (301.04 KB, 640x480 - viewed 1561 times.)
Logged
tom

Offline Offline





Ignore
« Reply #74 on: March 29, 2012, 10:22:30 PM »

Take a look at Block 207A close-ups. ( top and bottom elevations )

Painting started on the gable wall, after much survey and marking of uneven surfaces. Sanding down was carried out prior to painting work. At the time of taking this picture, the gable wall had been painted, probably not the final coat.



* P3240411.JPG (260.29 KB, 640x480 - viewed 1500 times.)

* P3240412.JPG (321.16 KB, 640x480 - viewed 1538 times.)
Logged
tom

Offline Offline





Ignore
« Reply #75 on: March 29, 2012, 10:49:34 PM »

Block 208C also with one gable wall painted.

The whole Block has 3 or 4 hanging gondolas with workers still grinding, cement grouting, touching up of wall facades.

There are still plenty of touching up work before the initial coat of paint can be applied to the whole building.



* P3240427.JPG (282.69 KB, 640x480 - viewed 1416 times.)

* P3240430.JPG (259.86 KB, 640x480 - viewed 1534 times.)

* P3240439.JPG (329.38 KB, 640x480 - viewed 1559 times.)
Logged
Pages: 1 ... 17 18 [19] 20 21 ... 34   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.147 seconds with 20 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server