Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
September 19, 2024, 05:56:07 PM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 ... 19 20 [21] 22 23 ... 34   Go Down
  Print  
Author Topic: Pictures of work in progress ( HDB BTO Punggol Sails )  (Read 189414 times)
0 Members and 2 Guests are viewing this topic.
tom

Offline Offline





Ignore
« Reply #80 on: May 03, 2012, 10:48:17 AM »

For the past weeks inspection teams were busy inspecting the building facades for uneven surfaces to be make good.

Uneven surfaces were marked and to be grind smooth, touching up with plasterings where necessary for another inspection before painting.

Gondolas were hung practically to most blocks for the above work to be executed. Vertical elevators were also being utilised to expediate the process.





* P5010428.JPG (255.94 KB, 640x480 - viewed 2053 times.)

* P5010432.JPG (314.1 KB, 640x480 - viewed 2105 times.)

* P5010373.JPG (242.24 KB, 640x480 - viewed 2127 times.)

* P5010386.JPG (237.74 KB, 640x480 - viewed 2132 times.)
Logged


Advertisement



tom

Offline Offline





Ignore
« Reply #81 on: June 26, 2012, 11:55:00 AM »

A 250 ton mobile crane and a smaller mobile crane were stationed in between Blocks 208C and 208B for dismantling work.

Two vertical blue steel frames sections of the tower crane were taken down and placed on wooden spacers on the ground.

A few moments later a trailer truck arrived, reversed for loading. Within minutes, one section was picked up by the smaller crane and loaded onto the trailer to be carted away.



* P6251130.JPG (272.44 KB, 640x480 - viewed 1761 times.)

* P6251126.JPG (311.99 KB, 640x480 - viewed 1319 times.)

* P6251134.JPG (327.24 KB, 640x480 - viewed 1334 times.)

* P6251137.JPG (321.34 KB, 640x480 - viewed 1317 times.)
Logged
tom

Offline Offline





Ignore
« Reply #82 on: June 26, 2012, 12:23:46 PM »

Take a look at a few perspective shots from across Punggol Field, right in front of Punggol Sapphire.



* P6220803.JPG (283.57 KB, 640x480 - viewed 1284 times.)

* P6220806.JPG (293.31 KB, 640x480 - viewed 1312 times.)

* P6220810.JPG (312.63 KB, 640x480 - viewed 1284 times.)
Logged
Sailer

Offline Offline





Ignore
« Reply #83 on: June 27, 2012, 10:16:38 AM »

Blk 208C seems to be the first candidate to collect keys  as the work seem to be faster than the others instead of 208A and 208B.. any idea? Thought normally 208A then 208B..then 208C. Huh? waving
Logged
Pages: 1 ... 19 20 [21] 22 23 ... 34   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.15 seconds with 20 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server